henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

A sample of hydrogen gas is collected over water at 25°C. The vapor pressure of water at 25°C is 23.8 mmHg. If the total pressure is 523.8 mmHg, what is the par
What is the percent of change from 400 to 500?
Why is Neon in the same group of the periodic table as Helium?
Who was the first person on EARTH?
Many businesses have been reluctant to embrace cloud computing citing _____ concerns.
Select all that apply. The "twelve-tone" technique _____. ensures that the 12 notes are given equal importance ensures that the music will be on key is charac
While the signalman is describing the actions of the person he sees by the mouth of the tunnel, the narrator says in his mind, "For God's sake clear the way!" W
Why was the Manhattan Project kept top secret? A: The Allies were afraid that the technology would be stolen by spies belonging to Germany or Japan. B: No one
Psychologists vary in agreement on the validity of __________. A
A formal letter should use A. complex sentence structure. B. colloquialisms. C. slang terminology. D. loosely-connected sentences.