ronieshabrown13
ronieshabrown13 ronieshabrown13
  • 02-12-2021
  • Mathematics
contestada

a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Fill in the blanks: El cine Palacios está ___________ restaurante Pancho. El restaurante Pancho está ___________ centro comercial. El centro comercial está ____
y = -=x + 5 for x = 0, 2, 4
Z3 26. The entrance of the old town library is 2.3 feet above ground level. A ramp from the ground level to the library entrance is scheduled to be built. The a
What a proportion and a ratio
When 1,250 Superscript three-fourths is written in simplest radical form, which value remains under the radical?2568
Given the unbalanced equation:- Al(SO )3 + - Ca(OH)2 +_ Al(OH)3 + caso,What is the coefficient in front of the caso, when the equation is completely balanced wi
Plz explain your answer.
the world future society Predicts that by the year 2020, airplanes will be able to carry 1400 passengers. Today's biggest jets can carry 600 passengers. What wi
Given that point S is equidistant from the sides of triangle WXY, find the following measures. SU - 5, 12, 13, or 18 M m
Evaluate x-2 for x=8