Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Which of these is a way that bio stimulation can be used ?
identify the region of the sacrum that articulates with the hip bone.
rewrite 17/20 and 13/15 so that they have a common denominator.
A 75-year-old male is postexploratory laparotomy with a total gastrectomy for gastric cancer. He is postoperative day 2 and has developed a fever of 38.5°C (101
Successful public speaking is more likely due to intuition and natural ability than planning and forethought True False
2. In a relationship between variables, what is the variable called that changes in response to another variable? O function O input function O independent vari
For which value of m does the graph of y = 18x2 mx 2 have exactly one x-intercept? 0 9 12 16
a woman saves $300 a month for 12 months for the next 12 months .How much does she save in total???????
When does the President approve a Bill?
I NEED SOME ONE WHO IS GOOD AT SPANISH TO ANSWER THIS QUESTION ILL MARK YOU THE BRAINLIEST NO LINKS !!!