kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Which European colonial power settled the farthest north on the continent of North America?
there are 17 men and 26 women in a choir the choir is going to sing at a concert one of the men and women are going to be chosen to make a pair to sing the firs
The point-slope form of the equation of the line with slope 4 passing through the point (1, 2) is
Which subatomic particle participates in covalent and ionic bonds?
How do I do this answer in a destructive property? -3 (n-4)
Assume each tick mark represents 1 cm. Calculate the total displacement from 0 if an object moves 3 cm to the left, then 7 cm to the right, and then 6 cm to the
Describe the impact of the neolithic agricultural revolution on the development of civilization
What property is being used in the equation 3a+0=3a
Algebra 1: Equation or InequalityProblem is in the picture! The answer that I got was 10. Was I correct? Thanks!
Kevin and Brittany write an equation to represent the following relationship, and both students solve their equation. Who found the correct equation and solutio