raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Is it A, B, C, or D?
What is the slope of a line parallel to the line whose equation is 18x – 3y = -45. Fully simplify your answer.
What do all fossil fuels have in common? O A. They are all burned when used as energy sources. O B. They are all renewable energy sources. O C. They all produce
Could someone please check my grammar homework? The words in bold are my answers ​
HURRY PLEASE ???!?!!!!!!!!!Which of the following is the inverse of
What would tan(x) equal in this equation?
In what direction is the line containing the points (-4, 3) and (-4, 14) going? A. horizontal B. vertical C. up and to the left D. down and to the right
For the afternoon showing of a film, a theater sold 100 tickets, each of which was either a $7.50 ticket for a child or a $10.00 ticket for an adult. If the the
Solve for q. 4. 3 9 + 2 Stuck? Watch a video or use a hint.​
(1 point) The manager of a large apartment complex knows from experience that 110 units will be occupied if the rent is 300 dollars per month. A market survey s